{"id":2194,"date":"2021-01-18T12:17:06","date_gmt":"2021-01-18T11:17:06","guid":{"rendered":"https:\/\/www.woehrle-svs.de\/?post_type=contribution&#038;p=2194"},"modified":"2024-12-19T10:01:59","modified_gmt":"2024-12-19T09:01:59","slug":"usv-redundancy-concepts","status":"publish","type":"contribution","link":"https:\/\/www.woehrle-svs.de\/en\/fachbeitrag\/usv-redundanzkonzepte\/","title":{"rendered":"UPS redundancy concepts"},"content":{"rendered":"<h4 id=\"begriffsklarung\" class=\"gb-headline gb-headline-b29aa1a2 gb-headline-text\">Clarification of terms<\/h4>\n\n\n\n<blockquote class=\"wp-block-quote is-layout-flow wp-block-quote-is-layout-flow\">\n<p class=\"wp-block-paragraph\"><strong>Redundancy:<\/strong><br>Redundancy is understood to mean the presence of more operational technical resources than are necessary to fulfill the intended function*.<br>This means having one more system or component available than is actually necessary. This means that if a component fails, the system function is maintained.<br><em>* Source: B\u00fcdenbender, Ulrich \/ Heintschel von Heinegg, Wolff \/ Rosin, Peter: Energierecht I - Recht der Energieanlagen, New York 1999.<\/em><\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Supply concepts:<\/strong><br>In principle, the power supply concepts can be implemented with one or two paths:<\/p>\n\n\n\n<figure class=\"wp-block-image\" id=\"attachment_5207\"><img decoding=\"async\" width=\"413\" height=\"209\" src=\"https:\/\/www.woehrle-svs.de\/wp-content\/uploads\/2021\/01\/w_svs_versorgungskonzept_pfad-1-e1643114287658.png\" alt=\"Supply concept with one path\" class=\"wp-image-5207\" srcset=\"https:\/\/www.woehrle-svs.de\/wp-content\/uploads\/2021\/01\/w_svs_versorgungskonzept_pfad-1-e1643114287658.png 413w, https:\/\/www.woehrle-svs.de\/wp-content\/uploads\/2021\/01\/w_svs_versorgungskonzept_pfad-1-e1643114287658-18x9.png 18w\" sizes=\"(max-width: 413px) 100vw, 413px\" \/><figcaption class=\"wp-element-caption\">Figure 1 Classic supply system with a mains supply, a load and a UPS in between, which is designed either as a single or redundant configuration.<\/figcaption><\/figure>\n\n\n\n<figure class=\"wp-block-image\" id=\"attachment_5208\"><img decoding=\"async\" width=\"410\" height=\"209\" src=\"https:\/\/www.woehrle-svs.de\/wp-content\/uploads\/2021\/01\/w_svs_versorgungskonzept_pfad-2.png\" alt=\"2 Mains supply paths\" class=\"wp-image-5208\" srcset=\"https:\/\/www.woehrle-svs.de\/wp-content\/uploads\/2021\/01\/w_svs_versorgungskonzept_pfad-2.png 410w, https:\/\/www.woehrle-svs.de\/wp-content\/uploads\/2021\/01\/w_svs_versorgungskonzept_pfad-2-18x9.png 18w\" sizes=\"(max-width: 410px) 100vw, 410px\" \/><figcaption class=\"wp-element-caption\">Figure 2: With two paths, two UPS systems are used with separate sub-distribution boards and separate power supplies (e.g. necessary with two separate fire compartments)<\/figcaption><\/figure>\n<\/blockquote>\n\n\n\n<h4 id=\"usvredundanzkonzepte\" class=\"gb-headline gb-headline-c6792c7c gb-headline-text\">UPS redundancy concepts<\/h4>\n\n\n\n<h4 id=\"beispiel-100kw-last-mit-einem-pfad\" class=\"gb-headline gb-headline-08333291 gb-headline-text\">Example: 100kW load with one path<\/h4>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Case 1:<\/strong> Single system, 100 % loadable (without redundancy)<br>\u2192 If the system fails, a reliable power supply is no longer available.<\/p>\n\n\n\n<figure class=\"wp-block-image\"><img decoding=\"async\" width=\"650\" height=\"95\" src=\"https:\/\/www.woehrle-svs.de\/wp-content\/uploads\/2021\/01\/w_svs_redundanzkonzept_fall_1-650x95.png\" alt=\"UPS redundancy concept case 1\" class=\"wp-image-5209\" srcset=\"https:\/\/www.woehrle-svs.de\/wp-content\/uploads\/2021\/01\/w_svs_redundanzkonzept_fall_1-650x95.png 650w, https:\/\/www.woehrle-svs.de\/wp-content\/uploads\/2021\/01\/w_svs_redundanzkonzept_fall_1-18x3.png 18w, https:\/\/www.woehrle-svs.de\/wp-content\/uploads\/2021\/01\/w_svs_redundanzkonzept_fall_1.png 665w\" sizes=\"(max-width: 650px) 100vw, 650px\" \/><\/figure>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Case 2:<\/strong> N+1 with 2x 100kW in parallel, each system 50 % loadable<br>\u2192 Common practice: The UPS power is doubled for the purpose of redundancy. With a load of over 50 %, one system could not take over the load if the second system fails.<\/p>\n\n\n\n<figure class=\"wp-block-image\"><img decoding=\"async\" width=\"650\" height=\"127\" src=\"https:\/\/www.woehrle-svs.de\/wp-content\/uploads\/2021\/01\/w_svs_redundanzkonzept_fall_2-650x127.png\" alt=\"UPS redundancy concept case 2\" class=\"wp-image-5210\" srcset=\"https:\/\/www.woehrle-svs.de\/wp-content\/uploads\/2021\/01\/w_svs_redundanzkonzept_fall_2-650x127.png 650w, https:\/\/www.woehrle-svs.de\/wp-content\/uploads\/2021\/01\/w_svs_redundanzkonzept_fall_2-18x4.png 18w, https:\/\/www.woehrle-svs.de\/wp-content\/uploads\/2021\/01\/w_svs_redundanzkonzept_fall_2.png 666w\" sizes=\"(max-width: 650px) 100vw, 650px\" \/><\/figure>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Case 3:<\/strong> N+1 with 3x 50kW in parallel, each system 67 % loadable<br>\u2192 In this case, the N+1 configuration is not implemented by doubling the power, but with smaller power components (modules) with 50 kW each. One module is therefore available for redundancy. Each system\/each module can be loaded more heavily so that the UPS systems are operated more efficiently in this case.<br><em>This case is predestined for plug-in modular systems. The configuration could also be realized with block UPS systems, but only with much higher infrastructure costs in terms of bypasses, power supplies and battery systems.<\/em><\/p>\n\n\n\n<figure class=\"wp-block-image\"><img decoding=\"async\" width=\"650\" height=\"157\" src=\"https:\/\/www.woehrle-svs.de\/wp-content\/uploads\/2021\/01\/w_svs_redundanzkonzept_fall_3-650x157.png\" alt=\"UPS redundancy concept case 3\" class=\"wp-image-5211\" srcset=\"https:\/\/www.woehrle-svs.de\/wp-content\/uploads\/2021\/01\/w_svs_redundanzkonzept_fall_3-650x157.png 650w, https:\/\/www.woehrle-svs.de\/wp-content\/uploads\/2021\/01\/w_svs_redundanzkonzept_fall_3-18x4.png 18w, https:\/\/www.woehrle-svs.de\/wp-content\/uploads\/2021\/01\/w_svs_redundanzkonzept_fall_3.png 665w\" sizes=\"(max-width: 650px) 100vw, 650px\" \/><\/figure>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Case 4:<\/strong> N+2 with 4x 50kW in parallel, each system 50 % loadable<br>\u2192 The configuration from case 3 can be extended as required by an additional 50kW module (N+2, N+3, ...). Although this increases the redundancy, the result is that the modules are again less loaded, making the configuration less efficient.<\/p>\n\n\n\n<figure class=\"wp-block-image\"><img decoding=\"async\" width=\"650\" height=\"194\" src=\"https:\/\/www.woehrle-svs.de\/wp-content\/uploads\/2021\/01\/w_svs_redundanzkonzept_fall_4-650x194.png\" alt=\"UPS redundancy concept case 4\" class=\"wp-image-5212\" srcset=\"https:\/\/www.woehrle-svs.de\/wp-content\/uploads\/2021\/01\/w_svs_redundanzkonzept_fall_4-650x194.png 650w, https:\/\/www.woehrle-svs.de\/wp-content\/uploads\/2021\/01\/w_svs_redundanzkonzept_fall_4-18x5.png 18w, https:\/\/www.woehrle-svs.de\/wp-content\/uploads\/2021\/01\/w_svs_redundanzkonzept_fall_4.png 669w\" sizes=\"(max-width: 650px) 100vw, 650px\" \/><\/figure>\n\n\n\n<p class=\"wp-block-paragraph\">Example: 100kW load with two paths<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Case 1:<\/strong> Two paths (A+B), 2x 100kW in parallel, each system 50 % loadable<br>\u2192 In this so-called 2N configuration, two systems are operated independently of each other in parallel. The load of one system is 50 %.<\/p>\n\n\n\n<figure class=\"wp-block-image\"><img decoding=\"async\" width=\"650\" height=\"130\" src=\"https:\/\/www.woehrle-svs.de\/wp-content\/uploads\/2021\/01\/w_svs_redundanzkonzept_fall_5-650x130.png\" alt=\"UPS redundancy concept Case 5\" class=\"wp-image-5213\" srcset=\"https:\/\/www.woehrle-svs.de\/wp-content\/uploads\/2021\/01\/w_svs_redundanzkonzept_fall_5-650x130.png 650w, https:\/\/www.woehrle-svs.de\/wp-content\/uploads\/2021\/01\/w_svs_redundanzkonzept_fall_5-18x4.png 18w, https:\/\/www.woehrle-svs.de\/wp-content\/uploads\/2021\/01\/w_svs_redundanzkonzept_fall_5.png 670w\" sizes=\"(max-width: 650px) 100vw, 650px\" \/><\/figure>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Case 2:<\/strong> Two paths, 2x 100kW each in parallel, each system 25 % loadable<br>\u2192 The UPS power was doubled in each path so that two systems with 100kW each are available per path, resulting in a total power of 400kW. This results in an even lower load on the individual systems, meaning that this configuration is not worth striving for.<\/p>\n\n\n\n<figure class=\"wp-block-image\"><img decoding=\"async\" width=\"650\" height=\"193\" src=\"https:\/\/www.woehrle-svs.de\/wp-content\/uploads\/2021\/01\/w_svs_redundanzkonzept_fall_6-650x193.png\" alt=\"UPS redundancy concept Case 6\" class=\"wp-image-5214\" srcset=\"https:\/\/www.woehrle-svs.de\/wp-content\/uploads\/2021\/01\/w_svs_redundanzkonzept_fall_6-650x193.png 650w, https:\/\/www.woehrle-svs.de\/wp-content\/uploads\/2021\/01\/w_svs_redundanzkonzept_fall_6-18x5.png 18w, https:\/\/www.woehrle-svs.de\/wp-content\/uploads\/2021\/01\/w_svs_redundanzkonzept_fall_6.png 663w\" sizes=\"(max-width: 650px) 100vw, 650px\" \/><\/figure>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Case 3:<\/strong> Two paths, 3x 50kW each in parallel, each system 33 % loadable<br>\u2192 Redundancy was created for each path using smaller power modules. The total output is now only 300 kW, meaning that the systems are better utilized and therefore more efficient in operation.<\/p>\n\n\n\n<figure class=\"wp-block-image\"><img decoding=\"async\" width=\"650\" height=\"256\" src=\"https:\/\/www.woehrle-svs.de\/wp-content\/uploads\/2021\/01\/w_svs_redundanzkonzept_fall_7-650x256.png\" alt=\"UPS redundancy concept Case 7\" class=\"wp-image-5215\" srcset=\"https:\/\/www.woehrle-svs.de\/wp-content\/uploads\/2021\/01\/w_svs_redundanzkonzept_fall_7-650x256.png 650w, https:\/\/www.woehrle-svs.de\/wp-content\/uploads\/2021\/01\/w_svs_redundanzkonzept_fall_7-18x7.png 18w, https:\/\/www.woehrle-svs.de\/wp-content\/uploads\/2021\/01\/w_svs_redundanzkonzept_fall_7.png 666w\" sizes=\"(max-width: 650px) 100vw, 650px\" \/><\/figure>\n\n\n\n<h4 id=\"effizienzsteigerung-durch-einschubmodulare-systeme\" class=\"gb-headline gb-headline-6289728a gb-headline-text\">Increased efficiency through slide-in modular systems<\/h4>\n\n\n\n<p class=\"wp-block-paragraph\">If an N+1 configuration is implemented with a block UPS system, this results in a total output of 200kW using the example of a 100kW load - made up of a 100kW load and 100kW redundancy.<br>If, on the other hand, a plug-in modular UPS system with 50kW modules is used, the required output of 100kW is covered by two modules and only one additional module and therefore only 50kW is required as redundancy. This results in a total output of 150kW.<br>An N+1 configuration with 25kW modules results in a total output of only 125kW, which equates to a saving of 37.5 % compared to the block UPS system.<\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><img decoding=\"async\" src=\"https:\/\/www.woehrle-svs.de\/wp-content\/uploads\/2021\/01\/w_svs_gegenueberstellung-1024x458.webp\" alt=\"\"\/><\/figure>\n\n\n\n<h4 id=\"einsparpotenzial\" class=\"gb-headline gb-headline-135e7600 gb-headline-text\">Savings potential<\/h4>\n\n\n\n<p class=\"wp-block-paragraph\">While block UPS systems typically have efficiencies of less than 90 % at loads of over 50 %, withdrawable UPS systems from W\u00f6hrle achieve efficiencies of 96 % and higher even at low loads:<\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><img decoding=\"async\" src=\"https:\/\/www.woehrle-svs.de\/wp-content\/uploads\/2021\/01\/w_svs_einsparpotenzial-1024x500.webp\" alt=\"\"\/><\/figure>\n\n\n\n<p class=\"wp-block-paragraph\">A potential saving of 2% sounds small, but when you take a closer look, it makes a big difference in terms of power consumption, energy costs and CO\u2082 emissions. Take a look at our white paper \"<a href=\"https:\/\/www.woehrle-svs.de\/en\/technical-contribution\/usv-repowering\/\">UPS repowering is climate protection<\/a>\" and find out how improving efficiency can lead to savings of several thousand euros per year.<\/p>\n\n\n\n<h4 id=\"weitere-effizienzsteigerung-durch-leistungsvirtualisierung\" class=\"gb-headline gb-headline-e4a568a6 gb-headline-text\">Further increase in efficiency through \"performance virtualization\"<\/h4>\n\n\n\n<p class=\"wp-block-paragraph\">Our UPS modules have a <a href=\"https:\/\/www.woehrle-svs.de\/en\/technical-contribution\/save-electricity-while-you-sleep\/\">Hibernation mode<\/a>. The UPS modules can be set so that they switch automatically every 14 days, for example, and are in sleep mode for this time. The module's inverter is not active during this time, but the module switches on automatically when required. The advantage of this is not only the increase in efficiency, but also the protection of the components, as wearing parts such as capacitors are protected during this time<\/p>\n\n\n\n<h4 id=\"hotswapfahigkeit\" class=\"gb-headline gb-headline-6befc0a3 gb-headline-text\">Hot-swap capability<\/h4>\n\n\n\n<p class=\"wp-block-paragraph\">Individual modules can also be replaced during operation without shutting down the system or switching to the bypass. This provides an enormous advantage for service and maintenance work and means that this can be carried out quickly and efficiently without compromising the security of supply to the load during this period.<\/p>\n\n\n\n<h4 id=\"vorteile-von-einschubmodularen-usvsystemen-auf-einen-blick\" class=\"gb-headline gb-headline-13760beb gb-headline-text\">Advantages of rack-mounted UPS systems at a glance<\/h4>\n\n\n\n<figure class=\"wp-block-image size-large\"><img decoding=\"async\" src=\"https:\/\/www.woehrle-svs.de\/wp-content\/uploads\/2021\/01\/w_svs_vorteile_modulare_usv-1024x518.webp\" alt=\"\"\/><\/figure>\n\n\n\n<h4 id=\"effizienz%c2%b3\" class=\"gb-headline gb-headline-d7d56f5e gb-headline-text\">Efficiency\u00b3<\/h4>\n\n\n\n<figure class=\"wp-block-image\"><img decoding=\"async\" src=\"https:\/\/www.woehrle-svs.de\/wp-content\/uploads\/2021\/01\/w_svs_effizienz.png\" alt=\"Efficiency\u00b3\" class=\"wp-image-5219\"\/><\/figure>","protected":false},"featured_media":15193,"template":"","meta":{"_acf_changed":false,"footnotes":""},"contributioncat":[73,68,70,71,69],"global-tag":[80],"class_list":["post-2194","contribution","type-contribution","status-publish","has-post-thumbnail","hentry","contributioncat-allgemein","contributioncat-gebaeudeinfrastruktur","contributioncat-industrie-fertigung","contributioncat-it-infrastruktur","contributioncat-usv-anlagen","global-tag-legacy-migration-complete"],"acf":[],"_links":{"self":[{"href":"https:\/\/www.woehrle-svs.de\/en\/wp-json\/wp\/v2\/contribution\/2194","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.woehrle-svs.de\/en\/wp-json\/wp\/v2\/contribution"}],"about":[{"href":"https:\/\/www.woehrle-svs.de\/en\/wp-json\/wp\/v2\/types\/contribution"}],"version-history":[{"count":3,"href":"https:\/\/www.woehrle-svs.de\/en\/wp-json\/wp\/v2\/contribution\/2194\/revisions"}],"predecessor-version":[{"id":13970,"href":"https:\/\/www.woehrle-svs.de\/en\/wp-json\/wp\/v2\/contribution\/2194\/revisions\/13970"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.woehrle-svs.de\/en\/wp-json\/wp\/v2\/media\/15193"}],"wp:attachment":[{"href":"https:\/\/www.woehrle-svs.de\/en\/wp-json\/wp\/v2\/media?parent=2194"}],"wp:term":[{"taxonomy":"contributioncat","embeddable":true,"href":"https:\/\/www.woehrle-svs.de\/en\/wp-json\/wp\/v2\/contributioncat?post=2194"},{"taxonomy":"global-tag","embeddable":true,"href":"https:\/\/www.woehrle-svs.de\/en\/wp-json\/wp\/v2\/global-tag?post=2194"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}